Home / Canal History / 1970 to 1998 / Canal Works 42
Physical works on the canal such as the construction of the Scott Russell Aqueduct over the Edinburgh by-pass in 1986 and the new bridge at Preston Road, Linlithgow - the first blockage on the canal to be removed in 1992. Also included are photographs of work undertaken by LUCS at the Linlithgow Canal Basin.
- 219 LUCS V0197 Preston Road blockage east side
- 219 LUCS V1196 Newly completed Preston Rd bridge 1992
- 219 Preston Road Blockage West Side
- 223 LUCS H5010 Kettlestoun breach
- 223 LUCS H5012 Kettlestoun breach
- 223 LUCS H5015 Kettlestoun breach repairs
- 223 LUCS H5016 Kettlestoun breach repairs
- 223 LUCS H5017 Kettlestoun breech repairs complete
- 224 LUCS H5014 Kettlestoun breach repairs
- 227 LUCS H5011 Kettlestoun breech dam
- 227 LUCS H5013 Kettlestoun breach repairs
- 234 LUCS A2182 Canal dewatered at Woodcockdale 1985