- 238 LUCS H0076 Mr Howieson's boatyard by Avon Aqueduct
Mr Howieson's boatyard on west side of Avon Aqueduct with dry dock roofed over circa 1922 - 238 LUCS H0078 Dry dock west of Avon Aqueduct
Dry dock west of Avon Aqueduct 1951 - 238 LUCS H0081 Ice breaker in dry dock by Avon Aqueduct
Ice breaker in dry dock west of Avon Aqueduct - 238 LUCS H5003 Avon Aqueduct from keeper's cottage
Avon Aqueduct from dry dock keeper's cottage before its restoration - 238 LUCS V0228 U60 in dry dock by Aqueduct
U60 in dry dock by Aqueduct - 238 LUCS V0229 U60 in dry dock by Aqueduct
U60 in dry dock by Aqueduct - 238 LUCS V0330 Firdale cottage and dry dock
Firdale cottage and dry dock - 242 LUCS V0232 View west from bridge 49
View west from bridge 49 with material for aqueduct - 243 LUCS A1002 Watt 5 at transhipment basin 24/7/82
Watt 5 at transhipment basin 24/7/82 - 243 LUCS A2194 Victoria's first trip to transhipment basin 1992
Victoria's first trip and Canaletto to transhipment basin 1992 - 243 LUCS V0236 Causewayend transhipment basin
Causewayend transhipment basin - 243 LUCS V0240 Causewayend transhipment basin
Causewayend transhipment basin - 243 LUCS V0242 Crane base at Causewayend transhipment basin
Crane base at Causewayend transhipment basin - 243 LUCS V1057 Causewayend transhipment basin
Causewayend transhipment basin - 243 LUCS V1152 Aerial view of transhipment basin
Aerial view of transhipment basin - 243 LUCS V1219 Aerial view of transhipment basin
Aerial view of transhipment basin - 245 LUCS D0001 Slamanan Railway proposal
1835 plan of proposed Slamannan railway to link Monkland ironstone and coal fields with the canal at Muiravonside overlaid on a current map - 245 LUCS D0002 Slamanan Railway proposal
1835 plan of proposed Slamannan railway to link Monkland ironstone and coal fields with the canal at Muiravonside - 245 LUCS D0003 Causewayend basin map
1860 map of area around Causewayend transhipment basin showing railways and ironworks - Map from National Library of Scotland Collection - 245 LUCS D0004 Causewayend basin plan
Plan of railways that were at Causewayend basin drawn by John Aitken - 249 LUCS R0050 Work starts at Vellore Rd Bridge
Work starts at Bridge 51, Vellore Road - 249 LUCS R0051 West side earth dam at Vellore Rd
West side earth dam required for construction of Bridge 51 at Vellore Rd. - 249 LUCS R0052 Bridge construction at Vellore Rd
Construction of Bridge 51, Vellore Rd looking west - 249 LUCS R0054 Bridge construction at Vellore Rd
Shuttering being put in place during construction of Bridge 51, Vellore Rd looking west - 249 LUCS R0055 Concrete blockwork at Vellore Rd
Blockwork for eastern retaining walls at Bridge 51, Vellore Rd - 249 LUCS R0056 Bridge construction at Vellore Rd
South side reinforcing bars being put in place during the construction of Bridge 51, Vellore Road. - 249 LUCS R0057 Bridge construction at Vellore Rd
Bridge construction at Bridge 51, Vellore Rd looking east - 249 LUCS R0058 Vellore Rd during Bridge construction
Vellore Rd during the construction of Bridge 51. The road had to be raised here to ensure boats had sufficient headroom. - 249 LUCS R0060 Vellore Rd Bridge almost complete
Bridge 51 at Vellore Road almost complete looking west - 249 LUCS R0061 East side earth dam at Vellore Rd
East side earth dam required for construction of Bridge 51 at Vellore Rd. View shows south side retaining wall before infill was placed behind it