Home / Canal History / 1999 to 2002 / Falkirk Wheel 57
Work on the Falkirk Interchange to link the Union and Forth and Clyde Canals which included an 0.8 mile extension of the Union Canal to the new staircase locks, the upper Falkirk Wheel basin, a tunnel under the Roman Antonine Wall, the Falkirk Wheel, its Aqueduct and basin and the entrance lock from the basin to the Forth and Clyde Canal.
- 314 LUCS R0081 Greenbank Aqueduct construction
- 314 LUCS R0082 Greenbank Aqueduct construction
- 314 LUCS R0083 Greenbank Aqueduct construction
- 314 LUCS R0084 Greenbank Aqueduct construction
- 314 LUCS R0085 Greenbank Aqueduct construction
- 314 LUCS R0086 Greenbank Aqueduct
- 314 LUCS V1517 Greenbank Aqueduct construction
- 316 LUCS R0087 New canal extension at Tamfourhill
- 318 LUCS R0089 New canal extension at Tamfourhill
- 318 LUCS R0090 Construction Station Road Bridge
- 318 LUCS R0091 Construction Station Road Bridge
- 318 LUCS R0092 Completed Station Road Bridge
- 320 LUCS R0088 New canal extension before staircase locks
- 322 LUCS R0104 Staircase lock construction
- 322 LUCS R0105 Upper basin construction
- 322 LUCS R0106 Newly completed basin and locks
- 322 LUCS R0107 Newly completed staircase locks
- 322 LUCS V1458 Inspection of new locks
- 323 LUCS R0093 Starting upper basin works
- 323 LUCS R0094 Starting upper basin works
- 323 LUCS R0095 Upper basin works
- 323 LUCS R0096 New railway bridge
- 323 LUCS R0097 Upper basin works
- 323 LUCS R0098 Upper basin works
- 323 LUCS R0099 New tunnel works
- 323 LUCS R0100 Staircase lock construction
- 323 LUCS R0101 Upper basin works
- 323 LUCS R0102 Upper basin works
- 323 LUCS R0103
- 323 LUCS R0108 Newly completed tunnel